Timelapse of 1,200 tonne concrete lid lifted onto shaft of Tideway Thames Tunnel from mdesign lid storage Watch Video
Preview(s):
Gallery
Play Video: (Note: The default playback of the video is HD VERSION. If your browser is buffering the video slowly, please play the REGULAR MP4 VERSION or Open The Video below for better experience. Thank you!)
⏲ Duration: 0:17 👁 View: 340K times ✓ Published: 28-Mar-2024
Description: Work to build London’s £5bn super sewer, including its tunnels and shafts, is now fully complete after eight years of construction.<br/>To mark the construction of the tunnel being completed, a 1,200 tonne concrete lid was lifted onto a shaft in Stratford on Wednesday (March 27).<br/>
Play Video: (Note: The default playback of the video is HD VERSION. If your browser is buffering the video slowly, please play the REGULAR MP4 VERSION or Open The Video below for better experience. Thank you!)